Research activities and progress on the long pulse ECRH launcher for EAST

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Abstract


A long pulse Electron Cyclotron Resonance Heating (ECRH) system is developed on EAST tokamak for plasma heating and current profile tailoring. The ECRH system is designed to operate at 140GHz and to inject 4MW CW power. With respect to the physical objectives of the newly built ECRH system, a quasi-optical launcher is designed to inject 4MW continuous wave into plasma through an equatorial port. Gaussian beams delivered from evacuated corrugation waveguides will be focused and reflected by high thermal conductive metal mirrors, and then steered by using push-rod steering mechanism with entire scanning range of ±25° toroidally and over 30° poloidally in plasma cross section. The mirrors are carefully designed with mega watts power handling capability and optimum optical characteristics. The performance of steering mechanism has been tested before installation, an open-loop control system for ECRH launcher has been implemented for required mirror movement and proper polarization between plasma discharges. This paper will present the overall design and progress of the launcher, along with the performance in EAST campaigns. Considerations and possible upgrade of the design features relevant to long pulse operation are discussed.

Volume 203
Pages 2012
DOI 10.1051/EPJCONF/201920302012
Language English
Journal None

Full Text