RAIRO Oper. Res. | 2021

Multi-objective multi-factory scheduling

 
 

Abstract


This paper introduces a multi-factory scheduling problem with heterogeneous factories and parallel machines. This problem, as a major part of supply chain planning, includes the finding of a suitable factory for each job and the scheduling of the assigned jobs at each factory, simultaneously. For the first time, this paper studies multi-objective scheduling in the production network in which each factory has its customers and demands can be satisfied by itself or other factories. In other words, this paper assumes that jobs can transfer from the overloaded machine in the origin factory to the factory, which has fewer workloads by imposing some transportation times. For simultaneous minimization of the sum of the earliness and tardiness of jobs and total completion time, after modeling the scheduling problem as a mixed-integer linear program, the existing multi-objective techniques are analyzed and a new one is applied to our problem. Since this problem is NP-hard, a heuristic algorithm is also proposed to generate a set of Pareto optimal solutions. Also, the algorithms are proposed to improve and cover the Pareto front. Computational experiences of the heuristic algorithm and the output of the model implemented by CPLEX over a set of randomly generated test problems are reported.

Volume 55
Pages S1447-S1467
DOI 10.1051/ro/2020044
Language English
Journal RAIRO Oper. Res.

Full Text