IOP Conference Series: Earth and Environmental Science | 2021

Design and Development of Intelligent Control System for Full Performance Test

 
 
 
 
 

Abstract


Design and develop the intelligent management and control system for the full performance test of the smart electric energy meter to realize the intelligent detection of the full performance test of the electric energy meter. The test intelligent control system is compatible with the automatic connection and disconnection technology of a variety of metering equipment, and realizes the automatic connection and disconnection and automatic testing of the equipment. Complete the automatic capture of abnormal phenomena and automatic judgment of unqualified items, complete the design and validity verification of the electromagnetic compatibility test automatic detection implementation plan. During manual test operation, various circuits and test points can be switched manually to realize automatic testing of various tests. The test intelligent management and control system realizes the system flexible scheduling control strategy, and completes the intelligent scheduling of the status of the equipment to be inspected and the idle status of each test unit.

Volume 769
Pages None
DOI 10.1088/1755-1315/769/4/042098
Language English
Journal IOP Conference Series: Earth and Environmental Science

Full Text