2019 International Conference on Industrial Engineering and Systems Management (IESM) | 2019

Influence of no-wait and time lag constraints in flowshop scheduling systems

 
 

Abstract


This paper deals with waiting time constraints in the well-known flowshop layout for makespan and flowtime objectives. Especially no-wait constraint and limited time lags are compared. Here, time lags are seen as a relaxation of the no-wait assumption which correlates with a potential increase of the solution space. Because this work is only the first step of examination, next to a detailed overview of previous works, this paper presents a method, i.e. complete enumeration, for evaluating the waiting time constraints by focusing on dominances regarding solution quality and speed.

Volume None
Pages 1-6
DOI 10.1109/IESM45758.2019.8948177
Language English
Journal 2019 International Conference on Industrial Engineering and Systems Management (IESM)

Full Text