Archive | 2019

Commissioning of Positron Damping Ring and the Beam Transport for SuperKEKB

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Abstract


The Positron Damping Ring (DR) for SuperKEKB successfully started its operation in February 2018, and the commissioning was continued until the end of SuperKEKB Phase 2 in July without serious troubles. This paper describes achievements of the beam commissioning of injection and extraction lines (LTR and RTL) between the LINAC and DR. In the LTR commissioning, the positron beam with high emittance, wide energy spread, and high charge were transported and injected into the DR. In the RTL commissioning, special cares were necessary to preserve the low emittance. The observed emittance growth in the RTL was not a problem for Phase 2, but it should be resolved in the coming Phase 3. In this proceedings, the commissioning of the DR will be also reported.

Volume None
Pages 152-156
DOI 10.18429/JACOW-EEFACT2018-TUPAB07
Language English
Journal None

Full Text