Ensiklopedia of Journal | 2021

KAJIAN UPAH PEKERJA KONSTRUKSI PADA PROYEK BANGUNAN GEDUNG DI PROVINSI SUMATERA BARAT

 
 

Abstract


In the world of the construction industry, the wages of workers are quite large, which is about one-third of the construction value. So the company should pay serious attention to the wages of these workers. However, information regarding the wages of construction workers is only in the form of daily wages for casual workers and monthly wages for permanent workers, while information on the cost of workers costs is not available. This study aims to identify the components of labor costs and their proportion to the overall cost of construction workers wages and to identify factors related to wages and costs of construction workers. In this study the method used is empirical and inductive methods, then the data obtained is processed and analyzed using descriptive statistics and comparative analysis. To model the burden of labor costs into its components and their respective proportions, descriptive statistical methods are used, while to analyze the variables -variables that affect wages and costs of workers used comparative analysis method. From the results of data processing, conclusions are drawn using the inductive method as follows: 1) The costs of workers are grouped into direct and indirect costs, and conditional costs, but the distribution of each cost component between permanent workers and freelancers is different; 2) Company profile, project profile, and worker profile. have an effect on wages and costs of construction workers.

Volume None
Pages None
DOI 10.33559/eoj.v3i3.794
Language English
Journal Ensiklopedia of Journal

Full Text