Archive | 2021

MODERNIZATION THE STAGE OF METHYLAMINES RECTIFICATION IN JSC «ANHK»

 
 
 
 

Abstract


The article describes the experience of JSC «ANHK» in modernizing the most en ergy-intensive stage of methylamine production in replacing the outdated grooved plates. The low \nproductivity of the installation and the large diameters of the columns for the production of methyla mines forced to take a non-standard approach to the selection and replacement of internal contact \ndevices. The modernization made it possible to obtain a significant economic effect several times \ngreater than the costs of developing and implementing the project

Volume 1
Pages 97-98
DOI 10.36629/2686-9896-2021-1-1-97-98
Language English
Journal None

Full Text