Network


Latest external collaboration on country level. Dive into details by clicking on the dots.

Hotspot


Dive into the research topics where Bjørn Melve is active.

Publication


Featured researches published by Bjørn Melve.


ASME 2013 32nd International Conference on Ocean, Offshore and Arctic Engineering | 2013

Midscale Qualification Testing of End Fittings for High Temperature Flexible Pipes

Bjørn Melve; Einar Øren

The qualification of high temperature flexible risers was a critical element in the field development of the Norne and Asgard fields. At a later stage this also included the Kristin field. The high temperature leads to the selection of PVDF as the liner (pressure sheath) material. Due to numerous leaks from pressure sheath sliding in the end fittings of risers with three layer PVDF liners in the middle of 90’s, it was necessary to requalify the end fitting design. An extensive test 10 year program was initiated where mid-scale riser samples were cycled between the minimum and maximum operating temperatures. In the 10 year long test program were some test pipes were subjected to more than 1000 cycles without pressure sheath sliding or a failure. The modified end fittings were qualified for service.Copyright


Volume 6: Materials Technology; Polar and Arctic Sciences and Technology; Petroleum Technology Symposium | 2012

Composite Drilling Riser on Heidrun: A Decade in Operational Experience

Bjørn Melve; Kristin Nedrelid; Siv Arna Tanem; Lasse Kroknes; Stein H. Myrmel

A drilling riser joint with carbon fibre in the main structural body and titanium end flanges was put into service at the Heidrun TLP in 2001. The joint has an internal titanium liner. The joint was the first implementation of an offshore composite riser and was the end result of the Compriser project.The composite riser joint has an internal diameter of 560 mm (22”) and is 15 m (48 ft) long. The joint is a part of the marine riser. The joint has been in service for ten years and has been treated as its metallic counterparts.At the periodic inspection done in 2010, it was decided that the external layer needed refurbishment.Inspection and pressure testing showed that the properties of the joint had not changed during service.Copyright


Archive | 2006

Protection profile for subsea cables

Jan Erik Karlsen; Lars Hennig; Havard Ilstad; Bjørn Melve


Materials Performance | 2006

Coatings for high-temperature water immersion service

Bjørn Melve; Dana Ali


Archive | 2017

carcaça de tubo para controlar vibração induzida por fluxo em tubo ascendente

Bjørn Melve; Knut Aril Farnes


ASME 2017 36th International Conference on Ocean, Offshore and Arctic Engineering | 2017

Full-Scale Validation of Axial Carcass Loads in Flexible Pipe Structure From Cyclic Pressure and Temperature

Claus Kristensen; Jan Muren; Andreas Gjendal; Erik B. Hanssen; Bjørn Melve; Nils Sødahl; Bjørn Engh; Mario Søfferud


ASME 2017 36th International Conference on Ocean, Offshore and Arctic Engineering | 2017

Wear of Outer Sheath Materials in Flexible Pipes: Testing Methodology

Einar Øren; Marit Larsen; Frode Andres Kvilhaug; Bjørn Melve


ASME 2017 36th International Conference on Ocean, Offshore and Arctic Engineering | 2017

An Experimental and Numerical Investigation of the Effect of Axial Thermal Gradients in Flexible Pipes

Dag Fergestad; Frank Klæbo; Jan Muren; Pål Hylland; Tom Are Grøv; Hans I. Lange; Janne Kristin Økland Gjøsteen; Andreas Gjendal; Bjørn Melve; Claus Egeberg Kristensen


Archive | 2014

FLEXIBLE PIPE PRESSURE RELIEF

Bjørn Melve; Pål Are Eikrem; Knut-Aril Farnes


Offshore Technology Conference | 2013

Composite Choke and Kill Lines: Qualification and Pilot Installation

Kjetil Skaugset; Per Kristian Gronlund; Bjørn Melve; Kristin Nedrelid

Collaboration


Dive into the Bjørn Melve's collaboration.

Researchain Logo
Decentralizing Knowledge