Network


Latest external collaboration on country level. Dive into details by clicking on the dots.

Hotspot


Dive into the research topics where David K. Bower is active.

Publication


Featured researches published by David K. Bower.


ASME 2010 Joint Rail Conference, JRC2010 | 2010

Polyurethane coating of railroad ballast aggregate for improved performance

Marcus S. Dersch; Erol Tutumluer; Calvin T. Peeler; David K. Bower

This paper presents preliminary findings of a new technology currently being tested in a research project at the University of Illinois. The effectiveness of elastomer polyurethane coating of ballast is evaluated for its ability to reduce aggregate breakage and resulting ballast fouling. Railroad ballast degradation and fouling related to aggregate breakdown under heavy axle loads, poor drainage, mud pumping, and water/ballast pockets are among the most commonly encountered track substructure (ballast, subballast, and subgrade soil) problems. The structural integrity of seriously fouled ballast can be compromised leading to track instability and ultimately, train derailments. Because of this serious consequence, costly ballast maintenance activities, such as undercutting, tamping, and shoulder cleaning, are routinely performed by railroads especially on tracks serving the heavy axle load unit trains. In the research project, clean AREMA No.4 aggregates along with the polyurethane coated particles were subjected to realistic field loading conditions in a large shear box test apparatus used for strength testing of ballast at full gradation. The urethane coated ballast was allowed to set for 1, 3, 7, and 14 days prior to subjecting the samples up to 10 shear passes. Shear and normal stress data were gathered during testing; and the fines generated by all tested samples were collected and analyzed. Early findings show a major increase in the shear strength gained with the polyurethane coating, a decrease in the breakdown of the coated ballast, and a decrease in particle reorientation which could lead to a reduction in ballast settlement.Copyright


Archive | 2010

Composite pavement structures

Steven Hicks; David K. Bower; William Handlos


Archive | 2010

Composite materials comprising aggregate and an elastomeric composition

David K. Bower; Steven Hicks; Melissa Terry; Calvin T. Peeler


Archive | 2010

METHOD OF PRODUCING A COMPOSITE MATERIAL USING A MIXING SYSTEM

Steven Hicks; David K. Bower; William Handlos; Joe Kaul; Brian T. Arnott


Archive | 2010

Colored Composite Pavement Structure

Steven Hicks; David K. Bower; William Handlos


Transportation Research Board 90th Annual MeetingTransportation Research Board | 2011

Characterization of Polyurethane Coated Railroad Ballast Behavior

Marcus S. Dersch; Erol Tutumluer; Anthony P Mareno; Calvin T. Peeler; David K. Bower


Archive | 2017

estrutura de pavimento de compósito,e, método para pavimentação de uma área que define uma cavidade com uma estrutura de pavimento de compósito

Calvin T. Peeler; David K. Bower; Melissa Terry; Nicholas A Foley; Steven Hicks; William Handlos


Archive | 2017

material compósito, método de formação de um material compósito, sistema para formar uma composição elastomérica, e, método para reparar um pavimento

Calvin T. Peeler; David K. Bower; Melissa Terry; Steven Hicks


Archive | 2010

Structure de pavement composite

Steven Hicks; David K. Bower; William Handlos


Archive | 2010

Structure de trottoir à base d'un composite coloré

Steven Hicks; David K. Bower; William Handlos

Collaboration


Dive into the David K. Bower's collaboration.

Researchain Logo
Decentralizing Knowledge