Guo Yarong
Electric Power Research Institute
Network
Latest external collaboration on country level. Dive into details by clicking on the dots.
Publication
Featured researches published by Guo Yarong.
ieee pes asia pacific power and energy engineering conference | 2014
Liu Zhihui; Wang Yi; Chen Jian-min; Guo Yarong; Wang Xingguo; Li Zhongqing; Du Dingxiang; Li Xiao
With the continuous increasing load and construction of UHV, A plurality of EHV / UHV AC and DC transmission lines centralize in the load center. In order to analyze the interactive effects of AC or DC system when fault occurs, a hybrid simulation model on electromechanical and electromagnetic transient process of AC and DC is established for regional power grid. The electromagnetic transient model covers the EHV / UHV AC and DC transmission lines, EHV / UHV transformer and lots of generators. Various faults are simulated in four network partitions, including all kinds of AC and DC transmission faults. On the basis of simulation, the characteristics and interactive effects of AC and DC system is studied. Research results suggest that for load center with both DC and AC, AC system faults will cause multiple HVDC commutation failure, thereby affecting the performance of AC relay protection. For the power grid closely connected, the DC system blocking will not cause any problem on system stability.
ieee international conference on power system technology | 2016
Yu Yue; Guo Yarong; Li Yanjun; Zhan Rongrong
Circuit breaker failure protection (CBFP) is a widely used back-up protection in electrical power system. To avoid maloperation, the CBFP needs a long delay to confirm the status of the circuit breaker, which means the cut off time will be long, sometimes too long to keep the stability of the power system. Therefore, it is very important to propose an optimized method to calculate the CBFP delay time for improving the stability of the system. A CT current tail truncation algorithm based on a CT tailing current-short circuit current criterion plane has been shown in this paper, which can truncate CT tailing current quickly and thereby shorten the delay of CBFP. Without special configuration of P level CT, this algorithm ensures the reliability and rapidity of CBFP, significantly reduces the risk of system operation, and has good economic benefits.
Archive | 2016
Liang Xuming; Guo Yarong; Liu Huanzhang; Li Xiao; Zhou Zexin; Du Dingxiang; Wang Delin; Li Jing; Li Huixin; Li Zhongqing
Archive | 2016
Wang Xingguo; Liu Huanzhang; Zhou Zexin; Guo Yarong; Du Dingxiang
Archive | 2016
Du Dingxiang; Liu Huanzhang; Zhou Zexin; Li Xiao; Guo Yarong; Wang Xingguo
Archive | 2016
Du Dingxiang; Liu Huanzhang; Zhou Zexin; Liang Xuming; Guo Yarong; Wang Xingguo; Li Lianhai; Wang Delin; Li Xiao; Chen Xiangwen
Archive | 2016
Li Zhongqing; Gao Xiang; Li Wei; Jiang Xianguo; Wang Xingguo; Guo Yarong
Archive | 2016
Liu Huanzhang; Zhou Zexin; Du Dingxiang; Guo Yarong; Li Xiao; Liang Xuming; Wang Delin; Wang Xingguo
Archive | 2015
Liu Huanzhang; Zhou Zexin; Wang Xingguo; Du Dingxiang; Guo Yarong; Li Feng
Archive | 2017
Wang Xingguo; Liu Huanzhang; Zhou Zexin; Wang Delin; Liu Yu; Guo Yarong; Du Dingxiang; Li Xiao; Li Huixin; Xie Jun