H. O. Mohd Shahwahid
Universiti Putra Malaysia
Network
Latest external collaboration on country level. Dive into details by clicking on the dots.
Publication
Featured researches published by H. O. Mohd Shahwahid.
2010 International Conference on Financial Theory and Engineering | 2010
Abdul Rahim; H. O. Mohd Shahwahid
This paper examine the various committed new technology and improve logging activities ascribed in the ‘Logfisher’ Practice (LP) rather than Conventional Practice (CP). The result of cost analysis shows that the cost constitutes under LP is higher than under CP. Incremental average per ha total cost rose by 46.86% to RM13,576/ha. While the incremental average per m3 total cost increased by 57.41% to RM267.80/m3. Hence, CP was slightly more profitable and exceeds the Net Present Value (NPV) of LP. Similarly, the Benefit-Cost Ration (BCR) for CP is better than LP. On the other hand, the result of the economic analysis of 40-year period showed that the LP system (NPV = RM9302/ha) provided a higher level of overalls benefits and welfare to the society as a whole as opposed to CP (NPV = RM8497/ha).
Archive | 2009
Abdul Rahim; H. O. Mohd Shahwahid; M. A. Zariyawati
Journal of Tropical Forest Science | 2009
Abdul Rahim; H. O. Mohd Shahwahid
Journal of Tropical Forest Science | 2011
A. G. Nor Suryani; H. O. Mohd Shahwahid; P. A. Fauzi; R. Alias; R. P. Vlosky
Journal of Tropical Forest Science | 2012
Abdul Rahim; H. O. Mohd Shahwahid; S Mad Nasir; Ag Awang Noor; Selangor Darul Ehsan
The Malaysian Forester | 2011
H. O. Mohd Shahwahid; Zulnaidah Manan
The Malaysian Forester | 2009
Abdul Rahim; H. O. Mohd Shahwahid
International Antalya Hospitality Tourism and Travel Research conference proceedings, Antalya, Turkey, 9-12 December 2014 | 2014
M. N. Mohd Iqbal; H. O. Mohd Shahwahid; A. A. M. Amira Mas; Rahinah Ibrahim
The Malaysian Forester | 2012
A. S. Abdul-Rahim; H. O. Mohd Shahwahid; S. Mad-Nasir; A. G. Awang-Noor
The Malaysian Forester | 2011
H. O. Mohd Shahwahid; M. S. Farah