Featured researches published by Hans Sommer.


Archive | 2010

Tasks of Project Management

Hans Sommer

Regardless of whether the client handles project management autonomously or assigns it to external service providers – the more consequentially and extensive the various tasks are handled, the better the result is going to be. This applies in terms of function and architecture as well as economical optimization aspects, sticking to the specifi ed cost frame and clear sequences with adherence to the agreed schedule. For this reason, we are initially going to look at all the required tasks without assigning these to a specifi c management strategy.


Archive | 2016

Trends bei Gebäuden und Prozessen

Hans Sommer

Will man den aktuellen Zustand des Bauens und des dafur erforderlichen Projektmanagements beschreiben, ist ein Blick in die Vergangenheit nutzlich. Was ist in der Zwischenzeit passiert und warum hat sich alles so entwickelt, wie es sich heute darstellt? Man kann daraus lernen, wie man die Zukunft des Bauens positiv mitgestalten kann.


Archive | 2016

Konventionelle Planung mit Projektmanagement

Hans Sommer

Nach wie vor kommt der konventionellen Planung in Verbindung mit einem professionellen Bauprojektmanagement eine grose Bedeutung zu, da diese Verfahren noch einige Zeit am Markt Bestand haben werden. Von kompetenten Planern und Projektmanagern durchgefuhrt, lassen sich damit in Verbindung mit konventionellem Bauen auch gute Ergebnisse erzielen. Auserdem ist der Grosteil von Vorschriften aller Art noch darauf abgestimmt. Ungeachtet dessen sollte allerdings das baubegleitende Facility Management Consulting auch bei konventionellen Planungsverfahren von Beginn an mit einbezogen werden.


Archive | 2016

Planen und vorbereiten mit BIM und Lean Design Management

Hans Sommer

Mit der neuen Planungstechnologie Building Information Modeling (BIM) wird die Digitalisierung als ein groser Schritt hin zum industrialisierten Bauen genutzt, ohne dass es wesentliche Einschrankungen der Gestaltungsfreiheit gibt. Dabei eignet sich BIM nicht nur fur Neubauten, sondern im Zusammenspiel mit Laserscannern auch und gerade fur das Bauen im Bestand nach der Cradle-to-Cradle-Technologie. Als kooperative Planungsmethode braucht BIM eine entsprechende Steuerungsmethode wie das Lean Design Management, mit dem das Zusammenspiel der Partner terminlich geordnet wird. Schlieslich ist BIM eine geniale Basis fur eine industrialisierte Produktion und Vorfertigung sowie eine „just in time“ organisierte Ablauf- und Logistikplanung.


Archive | 2016

Professioneller Übergang zum Betrieb

Hans Sommer

Mag das Projekt noch so gut vorbereitet, geplant und ausgefuhrt sein – die Zufriedenheit des Bauherrn hangt letztlich davon ab, ob alles gut funktioniert, wenn die Nutzer bzw. die Mieter einziehen.


Archive | 2016

Klärung der Ziele und Projektvorbereitung

Hans Sommer

In dieser ersten Phase entscheidet sich die Zukunft eines Projektes grundsatzlich. Bei allem, was in dieser Phase falsch gemacht wird, kann in den spateren Phasen nur noch Kosmetik betrieben werden.


Archive | 2010

The Stages of Building Construction

Hans Sommer

Whenever a project manager wishes to coordinate, plan and control procedures at the building site in a proper manner, he or she must know the individual trades, their contexts and peculiarities, without having to think about it. Therefore, this chapter provides an overview of the essential services provided by the construction companies. The required depth of information here shown is the minimum required for process control. Here, we are looking more at principles and construction alternatives rather than individual details and construction processes but it must be pointed out that a construction manager generally delves even deeper into the matter.


Archive | 2010

The Road from Concept to Construction Order

Hans Sommer

The basis for success of a construction project, as far as content and execution are concerned, is laid at the start of a project and during the planning stage. Anything that has been left out or handled wrongly during this stage can only be repaired to a limited extent during building construction. Unfortunately, time is very frequently wasted during that stage, which then leads to hectic scenes during the execution of the project and to chances that were plain and simply missed. For this reason, we are going to look at this particular stage in detail.


Archive | 2010

Fundamentals of Project Execution

Hans Sommer

In order to assess the topic of project management better, one initially needs to have a certain idea of the general problematic and environment. What exactly can a client expect when he or she wishes to undertake a property project? What are the tasks he/she is responsible for as a client, so that he/she really gets what he/she wants? And, moreover, what types of different projects are there, in the fi rst place? Who exactly are the people involved, whom he is going to have to deal with in his or her capacity as client? What are the various options and strategies available for the execution of a given project? What are the respective consequences, advantages and disadvantages?


Archive | 2009

Die Phasen der Bauausführung

Hans Sommer

Vor dem Beginn der eigentlichen Arbeiten ist bei Grosbauvorhaben zunachst eine Infrastruktur zu schaffen.