Network


Latest external collaboration on country level. Dive into details by clicking on the dots.

Hotspot


Dive into the research topics where Isabel Gasch is active.

Publication


Featured researches published by Isabel Gasch.


Revista ingeniería de construcción | 2016

Beneficios económicos de la certificación LEED. Edificio Centro Ático: caso de estudio

Óscar Ribero; Deisy Garzón; Yezid A. Alvarado; Isabel Gasch

This article discusses the economic benefits of the implementation of the sustainable building LEED (Leadership in Energy and Environmental Design) certification in the Centro Atico building located in Bogota, Colombia. Initially, the consumption of water and electricity are determined, as well as the costs of construction and operation of the building under its original design (built without regard to the parameters set by LEED). Then, strategies to allow the Centro Atico building to obtain the LEED GOLD New Construction V3 2009 certification are proposed and the economic increases associated with them are calculated. Also, the new consumption of water and electricity, when these strategies are applied (modified design), and their operating costs are calculated. Finally, indicators of economic goodness of investment are determined using a cash flow analysis.


Revista ingeniería de construcción | 2016

Estudio técnico económico de alternativas del proceso de cimbrado y descimbrado en la construcción de un edificio de forjados de losa maciza de hormigón armado

Yezid A. Alvarado; Isabel Gasch; Pedro A. Calderón; Benjamín Torres

El objetivo del presente trabajo es definir diferentes alternativas de procesos constructivos, estimando cuales resultan ser las mas beneficiosas respecto a su plazo de ejecucion y su coste, para un edificio de forjados de losa maciza de hormigon armado. Para resolver los plazos de ejecucion se plantearon tres alternativas del proceso constructivo: Cimbrado y Descimbrado; Cimbrado, Clareado y Descimbrado; y Cimbrado, Recimbrado y Descimbrado, considerado 2, 3 y 4 plantas consecutivas apuntaladas. Para evaluar que procesos son validos, primero se calculan las cargas que se presentan durante el proceso constructivo mediante el Nuevo Procedimiento Simplificado y posteriormente se comprueba si se cumple o no, en cada una de las operaciones constructivas, la condicion de descimbrado. Para el edificio objeto de estudio se han obtenido como procesos viables economica y tecnicamente los procesos constructivos de Cimbrado, Clareado y Descimbrado con 3 y 4 plantas cimbradas.


Revista Ingeniería de Construcción | 2016

Economic benefits of LEED certification: a case study of the Centro Ático building

Óscar Ribero; Deisy Garzón; Yezid A. Alvarado; Isabel Gasch

This article discusses the economic benefits of the implementation of the sustainable building LEED (Leadership in Energy and Environmental Design) certification in the Centro Atico building located in Bogota, Colombia. Initially, the consumption of water and electricity are determined, as well as the costs of construction and operation of the building under its original design (built without regard to the parameters set by LEED). Then, strategies to allow the Centro Atico building to obtain the LEED GOLD New Construction V3 2009 certification are proposed and the economic increases associated with them are calculated. Also, the new consumption of water and electricity, when these strategies are applied (modified design), and their operating costs are calculated. Finally, indicators of economic goodness of investment are determined using a cash flow analysis.


Engineering Structures | 2010

A numerical study into the evolution of loads on shores and slabs during construction of multistorey buildings. Comparison of partial striking with other techniques

Yezid A. Alvarado; Pedro A. Calderón; Isabel Gasch; Jose M. Adam


Engineering Structures | 2015

Improving construction processes of concrete building structures using load limiters on shores

Manuel Buitrago; Yezid A. Alvarado; Jose M. Adam; Pedro A. Calderón; Isabel Gasch; Juan J. Moragues


Proceedings of the Institution of Civil Engineers - Structures and Buildings | 2014

Construction loads using a shoring–clearing–striking process

Isabel Gasch; Yezid A. Alvarado; Pedro A. Calderón; Salvador Ivorra


Informes De La Construccion | 2013

Transmisión de cargas entre forjados y puntales en un edificio de forjado reticular de casetón perdido utilizando clareado

Isabel Gasch; Yezid A. Alvarado; Pedro A. Calderón; Benjamín Torres


Engineering Structures | 2012

Temperature effects on load transmission between slabs and shores

Isabel Gasch; Yezid A. Alvarado; Pedro A. Calderón


Proceedings of the Institution of Civil Engineers - Structures and Buildings | 2016

Maximum loads on shores during the construction of buildings

Manuel Buitrago; Jose M. Adam; Yezid A. Alvarado; Pedro A. Calderón; Isabel Gasch


Engineering Structures | 2016

Designing construction processes in buildings by heuristic optimization

Manuel Buitrago; Jose M. Adam; Yezid A. Alvarado; Juan J. Moragues; Isabel Gasch; Pedro A. Calderón

Collaboration


Dive into the Isabel Gasch's collaboration.

Top Co-Authors

Avatar

Pedro A. Calderón

Polytechnic University of Valencia

View shared research outputs
Top Co-Authors

Avatar

Manuel Buitrago

Polytechnic University of Valencia

View shared research outputs
Top Co-Authors

Avatar

Benjamín Torres

Polytechnic University of Valencia

View shared research outputs
Top Co-Authors

Avatar

Jose M. Adam

Polytechnic University of Valencia

View shared research outputs
Top Co-Authors

Avatar

Juan J. Moragues

Polytechnic University of Valencia

View shared research outputs
Top Co-Authors

Avatar
Researchain Logo
Decentralizing Knowledge