Network


Latest external collaboration on country level. Dive into details by clicking on the dots.

Hotspot


Dive into the research topics where Lawrence Donald Willey is active.

Publication


Featured researches published by Lawrence Donald Willey.


ASME Turbo Expo 2003, collocated with the 2003 International Joint Power Generation Conference | 2003

Quantification and Measurement of Heavy-Duty Gas Turbine Combustion Emissions During Startup and Shutdown Operations

Lawrence Donald Willey; Michael Davi; Gordon Smith; John Almstead; Brahim Richani; Joel Chalfin; Krishna Venkataraman

Quantification and measurement of startup and shutdown (SU/SD) emissions for heavy-duty combustion gas turbines, along with many associated significant issues, are examined in this paper. Included are the regulatory drivers that have prompted increased requests to Original Equipment Manufacturers (OEMs) from gas turbine operators, now required to account for SU/SD emissions in their power plant air permit applications. Also discussed are the complex array of influence parameters for the most popular gas turbine combustors relative to power plant installation and operability characteristics. These issues are presented along with additional background to support a recommended total mass of pollutant per SU/SD event criteria. The complexity of the Continuous Emissions Monitoring Systems (CEMS) equipment used to accurately measure transient emissions is also examined. This assessment of CEMS is designed to help gas turbine users and regulators understand the basic difficulties and complications in formulating which—if any—SU/SD emissions compliance criteria should be included in air permits.Copyright


ASME Turbo Expo 2002: Power for Land, Sea, and Air | 2002

Electric Power Generation Equipment Specification and Supply in the Rapidly Changing Global Regulatory Scene

Lawrence Donald Willey; Joel Chalfin

The proliferation of new codes & standards for power generation equipment procurement, and their increased frequency of revision, contributes to an atmosphere of increasingly rapid change in global trade considerations. This dynamic environment has amplified intensely with each year, to an extent that the life cycle of a given standard is in many instances appreciably less than the delivery cycles of heavy machinery. Other issues are created by the slower pace of harmonization of codes & standards in the European Union (EU), US and elsewhere. These codes & standards cover requirements that include emissions, acoustics, and safety that exert pronounced effects on the design, manufacture, and integration of power plant components. Conformity assessment partnering and the importance of other expert interpretation services are a key component to successfully meeting evolving compliance requirements. Delivering Customer Fulfillment for the Order to Remittance (OTR) phase of a project must be circled back to the Inquiry to Order (ITO) front end of the business cycle for new proposals. Another interesting arena is the relationship of advanced prime mover design balanced with the need for standardization to meet these regulatory challenges in the face of high production volume. The typical power generation project cycle, measured in terms of years, coupled with the present high demand worldwide results in orders for equipment that in many cases can’t foresee regulatory requirements 2 to 3 years into the future. Examples include projects in the EU where the Pressure Equipment Directive (PED) and Atmospheres Explosive (ATEX) Directive have mandatory compliance dates of May 2002 and June 2003 respectively. Electric power generation Original Equipment Manufacturers (OEMs) and their suppliers must plan for and price into contracts compliance with these laws years before the equipment is built and shipped. This is further complicated by the interpretation of specific requirements and the definition of the OEM conformity assessment strategy. To rectify this situation, it is recommended that steps be initiated to accelerate the worldwide harmonization of technical standards. In addition, consideration for the delivery cycles and commissioning of new power plants must be included in the regulatory process and in setting the dates for mandatory compliance with regional law.Copyright


Archive | 2006

Methods and apparatus for controlling rotational speed of a rotor

Lawrence Donald Willey; John Noel Cunningham; Eric Gebhardt; Ulrich Uphues; William Edwin Holley; Kirk Gee Pierce


Archive | 2000

Seal assembly and rotary machine containing such seal

Osman Saim Dinc; Norman Arnold Turnquist; George Ernest Reluzco; Lawrence Donald Willey; Christopher Edward Wolfe


Archive | 2000

Turbine bucket cover and brush seal

Norman Arnold Turnquist; Lawrence Donald Willey; Christopher Edward Wolfe


Archive | 1997

Labyrinth seal for a turbine bucket cover

Lawrence Donald Willey


Archive | 2003

Method and apparatus for capture of grid characteristics corresponding to fluctuation events

Alaadin M. Suliman; Lawrence Donald Willey


Archive | 2009

Composite wind turbine tower

Lawrence Donald Willey; Danian Zheng; Agusti Porta; Tom Demint


Archive | 2009

Modular surface foundation for wind turbine space frame towers

Lawrence Donald Willey; Danian Zheng


Archive | 2009

Composite wind turbine tower and a method for fabricating same

Lawrence Donald Willey; Shu Ching Quek; Danian Zheng

Collaboration


Dive into the Lawrence Donald Willey's collaboration.

Top Co-Authors

Avatar
Top Co-Authors

Avatar
Top Co-Authors

Avatar
Top Co-Authors

Avatar
Top Co-Authors

Avatar
Top Co-Authors

Avatar
Top Co-Authors

Avatar
Top Co-Authors

Avatar
Top Co-Authors

Avatar
Top Co-Authors

Avatar
Researchain Logo
Decentralizing Knowledge