Network


Latest external collaboration on country level. Dive into details by clicking on the dots.

Hotspot


Dive into the research topics where Nuzul Azam Haron is active.

Publication


Featured researches published by Nuzul Azam Haron.


Total Quality Management & Business Excellence | 2015

Quality function deployment modelling to enhance industrialised building system adoption in housing projects

Nuzul Azam Haron; Hamzah Abdul-Rahman; Chen Wang; Lincoln C. Wood

A quality tool in achieving the required quality and customer satisfaction of the industrialised building system (IBS) is needed. Aiming to develop a general quality function deployment (QFD) model to enhance the adoption of IBS in housing projects, two sets of structured questionnaires were designed, where the first set was for IBS house occupiers and the second set for construction stakeholders. Frequency distribution, arithmetic measure, gap analysis, Pareto analysis, and QFD application were employed to identify the customer satisfaction factors and the IBS adoption strategies. A general QFD model was developed based on the ‘quality’ matrix (Q-Matrix), ‘function’ matrix (F-Matrix), and a combination of ‘quality’ matrix plus ‘function’ matrix (QF-Matrix) derived from this study. Customer satisfaction with IBS products could enhance the demand for this kind of building automation system, thus the model could be used more objectively in developing, designing, and managing IBS in the global construction industry, especially in the current economic recession and recovery phase.


Global Civil Engineering Conference | 2017

Causes of Delay and Cost Overrun in Malaysian Construction Industry

Muhammad Muhammad Tahir; Nuzul Azam Haron; Aidi Hizami Alias; Ikechukwu A. Diugwu

The construction industry in Malaysia drives the economic growth and development of the country. However, the industry is plagued with delays and cost overrun which transforms what should have been successful projects to projects incurring additional costs, disagreements, litigation and in some cases abandonment of projects. This research studied the causes of delays and cost overrun in the industry and ranked them according to their perceived importance to the contractors, with a view to establishing those to be addressed by the contractors. Online questionnaires were used for data collection for this research. A total of 69 responses were analysed using principal component analysis (PCA) (factor analysis) to identify the main causes. The result of the analysis showed that delay in preparation of design document, poor schedule and control of time, delay in delivery of material to site, lack of knowledge about the different defined execution methods, shortage of labour and material in market, and changes in scope of work were the main causes of delay and cost overrun. The identified causes if properly addressed would reduce the rate of delays and cost overrun in construction projects, thus enhancing the economic growth and development of the country.


International Journal of Research in Engineering and Technology | 2013

Factors Influencing the Rise of House Price in Klang Valley.

Nuzul Azam Haron; Cindy Liew


Transport Policy | 2017

Development of safety performance index for intercity buses: An exploratory factor analysis approach

Teik Hua Law; Mohd Shazwan Daud; Hussain Hamid; Nuzul Azam Haron


Jurnal Teknologi | 2016

TOWARDS DESIGNING MODULAR OF INDUSTRIALIZED BUILDING SYSTEMS

Mohsen Delfani; Rahinah Ibrahim; Mohammad Yazah Mat Raschid; Farzad Hejazi; Nuzul Azam Haron


Archive | 2018

Improving cost and time control in construction using Building Information Model (BIM): a review

Muhammad Muhammad Tahir; Nuzul Azam Haron; Aizul Nahar Harun; Isa Bala Muhammad; Dorothy Ladi Baba


Journal of Telecommunication, Electronic and Computer Engineering | 2018

Development of a Mobile Aquaculture Management Systems for Performance Monitoring of Aquaculture Players

Sharihan Fathi; Aizul Nahar Harun; Shuib Rambat; Mohd Nasrun Mohd Nawi; Nuzul Azam Haron


Archive | 2017

Implementation of Building Information Modelling (BIM) in Malaysia: a review

Nuzul Azam Haron; Raja Putri Zarifh Ana Raja Soh; Aizul Nahar Harun


IOP Conference Series: Materials Science and Engineering | 2017

Project management practice and its effects on project success in Malaysian construction industry

Nuzul Azam Haron; P Devi; S Hassim; Aidi Hizami Alias; Muhammad Muhammad Tahir; A N Harun


IOP Conference Series: Materials Science and Engineering | 2017

Applications of building information model (BIM) in Malaysian construction industry

Muhammad Muhammad Tahir; Nuzul Azam Haron; Aidi Hizami Alias; A T Al-Jumaa; I B Muhammad; Aizul Nahar Harun

Collaboration


Dive into the Nuzul Azam Haron's collaboration.

Top Co-Authors

Avatar

Aizul Nahar Harun

Universiti Teknologi Malaysia

View shared research outputs
Top Co-Authors

Avatar
Top Co-Authors

Avatar
Top Co-Authors

Avatar
Top Co-Authors

Avatar

A N Harun

Universiti Teknologi Malaysia

View shared research outputs
Top Co-Authors

Avatar

A T Al-Jumaa

Universiti Putra Malaysia

View shared research outputs
Top Co-Authors

Avatar
Top Co-Authors

Avatar

Cindy Liew

Universiti Putra Malaysia

View shared research outputs
Top Co-Authors

Avatar

Farzad Hejazi

Universiti Putra Malaysia

View shared research outputs
Top Co-Authors

Avatar

Hussain Hamid

Universiti Putra Malaysia

View shared research outputs
Researchain Logo
Decentralizing Knowledge