Tadashi Koshiduka
Toshiba
Network
Latest external collaboration on country level. Dive into details by clicking on the dots.
Publication
Featured researches published by Tadashi Koshiduka.
Journal of International Council on Electrical Engineering | 2011
Myo Min Thein; Hiroaki Toda; Hisatoshi Ikeda; Eiichi Haginomori; Tadashi Koshiduka
The transient recovery voltage (TRV) of the transformer limited fault (TLF) current interrupting condition has been investigated with several transformers by using current injection (CIJ) method. A transformer model for the TLF condition is treated as leakage impedance and a stray capacitance with an ideal transformer in a computation by EMTP. By using the frequency response analysis (FRA) measurement, the transformer constants were evaluated at high frequency regions. FRA measurement graphs showed that the leakage inductance value of the test transformers gradually decreases along with the frequency. From these results, frequency dependent transformer equivalent circu it was constructed. The frequency response of the model was good agreement with measurement.
ieee/pes transmission and distribution conference and exposition | 2010
Thein Myomin; Hisatoshi Ikeda; Hiroaki Toda; Katsuhiko Harada; Shinya Ohtsuka; Eiichi Haginomori; Tadashi Koshiduka
The authors investigated to calculate the transient recovery voltage (TRV) after the transformer limited fault current (TLF) interrupting condition. Several transformers were used to measure TRV by means of a current injection measurement method. To simulate the TRV at TLF interrupting condition alternative transients program-electromagnetic transients program (ATP-EMTP) was used. The transformer equivalent elements, such as leakage inductance, stray capacitance and resistances were derived from frequency versus impedance graph obtained by frequency response analysis (FRA) measurements. Experiment procedure, results, consideration of transformer constants and constructed EMTP transformer models of current interrupting condition for TRV calculation of tested transformer are presented in this paper. The TRV obtained by the EMTP simulation gave agreeable results with the measured values of the experiment in each case, while a limitation was found by using a constant leakage inductance value which depends on a frequency.
Archive | 2007
Tadashi Koshiduka; Minoru Saito; Susumu Nishiwaki; Nobuyuki Takahashi; Koichi Futagami; Yoshimasa Sato; Tsuyoshi Kokumai; Hiroshi Kusuyama
Archive | 2007
Tadashi Koshiduka; Minoru Saito; Susumu Nishiwaki; Nobuyuki Takahashi; Koichi Futagami; Yoshimasa Sato; Tsuyoshi Kokumai; Hiroshi Kusuyama
Ieej Transactions on Power and Energy | 2009
Myo Min Thein; Hisatoshi Ikeda; Katsuhiko Harada; Shinya Ohtsuka; Eiichi Haginomori; Tadashi Koshiduka
Electrical Engineering in Japan | 2009
Takeshi Shinkai; Tadashi Koshiduka; Tadashi Mori; Toshiyuki Uchii; Tsutomu Tanaka; Hisatoshi Ikeda
電気学会研究会資料. ED, 放電研究会 | 2009
Thein Myo Min; Hiroaki Toda; Katsuhiko Harada; Shinya Ohtsuka; Hisatoshi Ikeda; Eiichi Haginomori; Tadashi Koshiduka
Archive | 2016
Eiichi Haginomori; Tadashi Koshiduka; Junichi Arai; Hisatochi Ikeda
Archive | 2016
Eiichi Haginomori; Tadashi Koshiduka; Junichi Arai; Hisatochi Ikeda
Archive | 2013
Hiroaki Toda; Myo Min Thein; Hisatoshi Ikeda; Eiichi Haginomori; Tadashi Koshiduka