Takuji Yamamoto
Kajima
Network
Latest external collaboration on country level. Dive into details by clicking on the dots.
Publication
Featured researches published by Takuji Yamamoto.
Tunnelling and Underground Space Technology | 2003
Takuji Yamamoto; Suguru Shirasagi; Shinya Yamamoto; Yoshitada Mito; Kenji Aoki
In tunnel excavation by Tunnel Boring Machine (TBM), it is difficult to grasp the ground condition ahead of and surrounding the tunnel face because the face cannot be observed during tunnel driving. This is the reason why it has not been possible to make the best use of high-speed excavation capability of the TBM, especially in ground under complex conditions. Thus, the TBM Excavation Control System was developed to realize the accurate prediction of the geological condition ahead of and surrounding the tunnel face simultaneously with excavation. The special feature of this system is that geostatistical techniques are introduced into the data analysis using both drill logging data from pilot boring and TBM driving data obtained during excavation, in order to improve the precision of the ground mapping.
PROCEEDINGS OF TUNNEL ENGINEERING, JSCE | 1999
Takuji Yamamoto; Yukiyoshi Kitamoto; Kensuke Date; Michitaka Okamoto
With regard to the current practice of tunnelling construction for railways and roads it is desired that a more practical method be developed so as to save time and cost as well as more safety. Lecentry, long forepiling method has been used widely so that the tunnel crown settlement in soil ground, can be restrained. On the other hand, cost by such method is generally high in case special technique or machine must be adopted. In addition, the effect by reinforcement using forepiling method is difficult to be made clear theoretically. We developed a new forepiling method using middle length steel gas pipes for the purpose of lowering the construction cost with enough reinforcement effect. These reinforcement can be easily installed by conventional tunnelling machine. This paper reports the technical features and construction procedure. Next, the practical measuring results are shown. As a result, it is proved that the new forepiling method is effective in cost and reinforcement.
Archive | 2007
Masahiro Furukawa; Kenichi Inoue; Hiroshi Kasai; Satoshi Maruyama; Toshiaki Sato; Takuji Yamamoto; Shinkan Zen; 諭 丸山; 賢一 井之上; 敏亮 佐藤; 振煥 全; 政弘 古川; 拓治 山本; 浩 笠井
Journal of Hydrology | 2011
Yoshitada Mito; Mohd Ashraf Mohamad Ismail; Takuji Yamamoto
International Journal of the JCRM | 2011
Takuji Yamamoto; Suguru Shirasagi; Yasuhiro Yokota; Yu Koizumi
Archive | 2007
Chung-Gi Cho; Hiroshi Kasai; Noboru Sakata; Toshiaki Sato; Takuji Yamamoto; Hideaki Yazaki; Shinkan Zen; 敏亮 佐藤; 振煥 全; 昇 坂田; 拓治 山本; 英章 矢崎; 浩 笠井; 貞基 趙
Rock Mechanics and Rock Engineering | 2007
Kenji Aoki; Yoshitada Mito; Takuji Yamamoto; Suguru Shirasagi
International Journal of the JCRM | 2005
Satoru Miura; Takuji Yamamoto; Izuru Kuronuma; Michio Imai
Tunnelling and Underground Space Technology | 2016
Yasuhiro Yokota; Takuji Yamamoto; Suguru Shirasagi; Yu Koizumi; Jozef M. Descour; Matt Kohlhaas
10th ISRM Congress | 2003
Takuji Yamamoto; Suguru Shirasagi; Kenji Aoki; Jozef M. Descour