Hotspot


Archive | 2007

Wellbore method and apparatus for sand and inflow control during well operations

David C. Haeberle; Charles S. Yeh; Timothy G. Benish; Michael D. Barry; Michael T. Hecker; Jon Blacklock


Archive | 2008

Well Performance Modeling In A Collaborative Well Planning Environment

Timothy G. Benish; Scott R. Clingman; Bruce A. Dale; James E. Holl; Rune Musum


Archive | 2007

Method for comparing and back allocating production

Timothy G. Benish; Michael E. McCracken


Archive | 2013

Flow control assemblies for downhole operations and systems and methods including the same

Randy C. Tolman; Timothy G. Benish; Geoffrey F. Steiner


Eurosurveillance | 2008

Coupled Well and Reservoir Simulation Models to Optimize Completions Design and Operations for Subsurface Control

Jing Wan; Bruce A. Dale; Timothy Kirk Ellison; Timothy G. Benish; Marcel Grubert


SPE Russian Oil and Gas Technical Conference and Exhibition | 2006

Application of New Technology in the Completion of ERD wells, Sakhalin-1 Development

Mohamed Wael Helmy; Donald L. Yeager; Michael D. Barry; Charles S. Yeh; Timothy G. Benish; Andrew Jerome Veselka; Marcus Asmann


Archive | 2009

Systems and Methods For Regulating Flow In A Wellbore

Randy C. Tolman; Timothy G. Benish


Archive | 2008

Methods and Systems For Determining Near-Wellbore Characteristics and Reservoir Properties

Dieter Postl; Jason A. Burdette; James H. Lee; Timothy G. Benish; Bruce A. Dale


Archive | 2013

Systems and Methods for Stimulating A Multi-Zone Subterranean Formation

Randy C. Tolman; Timothy G. Benish; Geoffrey F. Steiner; Kris J. Nygaard


Archive | 2013

Fluid plugs as downhole sealing devices and systems and methods including the same

Randy C. Tolman; Timothy G. Benish; Geoffrey F. Steiner

Researchain Logo
Decentralizing Knowledge