Network


Latest external collaboration on country level. Dive into details by clicking on the dots.

Hotspot


Dive into the research topics where Tommaso Giusti is active.

Publication


Featured researches published by Tommaso Giusti.


31st International Symposium on Automation and Robotics in Construction | 2014

Constructability and Safety Performance Based Design: A Design and Assessment Tool for the Building Process

Pietro Capone; Vito Getuli; Tommaso Giusti

The theme of this contribution fits astride two strands of Construction Management Studies: “health and safety risk management” on construction site and “constructability” design approach. Specifically we faces two problems usually considered separately: the lack of specificity, synergy, effectiveness between safety planning and construction process and the lack of concurrence between design and construction process. The proposed approach assigns to design the key role of optimizing both constructability and safety planning in a unique and simultaneous procedure. The purpose is to improve “working plan” design level by specific construction simulation and the related safety assessment in the perspective of the better constructability performance and final building results. The proposed method is a Construction Management Approach supported by design tool based on working directly on design drawings. Starting from the representation of construction details, their construction can be simulated. This is obtained analyzing construction details by means of progressive drawings that express and simulate the breakdown of construction phases, chronologically processed and logically related. In these specific drawings all the elements of the construction site are graphically placed. The procedure allows both to perform the specific and detailed safety assessment for the realization of construction detail components, and to verify the constructability of them. The safety and constructability analysis is so performed in a graphical way during the design process not waiting the construction phase. So we are still able to intervene, if necessary, with amendments under the designer control.


32nd International Symposium on Automation and Robotics in Construction | 2015

A Decision Support System (DSS) for Constructability Assessment in Seismic Retrofit of Complex Buildings

Vito Getuli; Tommaso Giusti; Pietro Capone

Choosing the optimal strategy for the seismic retrofit of an existing building is a difficult problem. This difficulty increases in the case of complex buildings systems with different strategic requirements in terms of organization layout and structural features. This paper contributes to solving this complexity by combining management and technical strategies, especially in situations of comparable times and costs. It is demonstrated that the best way to obtain final results that are consistent with the initial requirements is to intervene at the beginning of the design stage. To this end the implementation of a Decision Support System (DSS) aided by Information Technology (IT) is presented for making a constructability assessment of the seismic retrofit of complex buildings. Different seismic retrofit scenarios compete to be the optimal retrofit solution. Several evaluation systems are combined with classic constructability-based tools to produce an organic framework. A rule-based engine that utilizes this framework can be implemented on top of userfriendly software. The DSS intends to control building management by prefiguring a real ongoing building execution after the early stages of the project. This is made possible by using the simulation of site safety layout in all compatible scenarios. By managing the output data of IT models it is possible to assess both management and structural strategies. In the end the DSS combines them to choose the most favorable overall solution. Looking towards future development, it can be seen that applications of a BIM Platform integrated with the proposed DSS have considerable potential in construction management practice.


PROBLEMI DI CONSERVAZIONE E RESTAURO | 2017

Applicazione del metodo per una proposta di trasferimento dell’O.P.D. alla Ex-Manifattura Tabacchi

Pietro Capone; Tommaso Giusti; Romina Benevieri


PROBLEMI DI CONSERVAZIONE E RESTAURO | 2017

Applicazione del metodo per un confronto tra l’O.P.D. ed il Centre de Recherche et de Restauration des Musées de France

Pietro Capone; Tommaso Giusti; Adriana Miri


PROBLEMI DI CONSERVAZIONE E RESTAURO | 2017

Applicazione del metodo per una proposta di trasferimento dell’O.P.D. alla Fortezza da Basso

Pietro Capone; Tommaso Giusti; Pierfrancesco Cristaudo; Antonio Iannalfi


Archive | 2017

Miglioramento della sicurezza dei lavoratori e delle opere nella sede O.P.D. di via degli Alfani: tecnologie avanzate di protezione sismica

Pietro Capone; Tommaso Giusti; Camilla Bitossi; Elena Mori


Archive | 2017

La salvaguardia dei contenuti artistici in caso di incendio nella sede O.P.D. della Fortezza da Basso

Tommaso Giusti


Proceedings of the 33rd International Symposium on Automation and Robotics in Construction (ISARC) | 2016

HBIM and Fire Prevention in Historical Building Heritage Management

Giulia Frosini; Carlo Biagini; Pietro Capone; Vincenzo Donato; Tommaso Giusti


CIB World Building Congress 2016 | 2016

Safety Constructability improvement adding spatial dimension and workers' safety in the Critical Path Method

Rana Alzayd; Vito Getuli; Tommaso Giusti; Pietro Capone


CIB World Building Congress 2016 | 2016

Design and safety: from the EU directives to the national legislation

Tommaso Giusti; Pietro Capone; Vito Getuli

Collaboration


Dive into the Tommaso Giusti's collaboration.

Top Co-Authors

Avatar
Top Co-Authors

Avatar

Vito Getuli

University of Florence

View shared research outputs
Top Co-Authors

Avatar
Top Co-Authors

Avatar
Top Co-Authors

Avatar

Elena Mori

University of Florence

View shared research outputs
Top Co-Authors

Avatar

Rana Alzayd

University of Florence

View shared research outputs
Researchain Logo
Decentralizing Knowledge