Network


Latest external collaboration on country level. Dive into details by clicking on the dots.

Hotspot


Dive into the research topics where Tracey Williamson is active.

Publication


Featured researches published by Tracey Williamson.


Dams and Reservoirs | 2017

ICOLD technical tours

Tracey Williamson; Andy Hughes; Ian Hope; Rafael Monroy

The ICOLD programme kicked off with an opportunity to attend a technical tour on Sunday, 15 May, 2016. There was also an opportunity to attend these tours again on 19 May 2016, discussed in the technical tours paper.


Dams and Reservoirs | 2017

Technical committee meetings

Andy Hughes; Tracey Williamson; Rafael Monroy; Ian Hope; Craig Scott; Ken Grubb

ICOLD presently has 26 technical committees. The committees met on 16 and 17 May 2016 and the Regional Club Meeting was held on the evening of 17 May 2016.


Dams and Reservoirs | 2015

Meeting report: ICOLD Annual Meeting and Congress 2015, Stavanger

Tracey Williamson; Andy Hughes; Ian Hope; Peter J. Mason; Rod Bridle; Ken Grubb; Samuel Tudor

The ICOLD Annual Meeting and Congress were held in Stavanger, in the southwest of Norway. Delegates from the BDS attended the various technical committee meetings, the general assembly, technical p...


Dams and Reservoirs | 2013

Technical visit: ICOLD 2013, Seattle, USA: technical tour TT4 Cushman Hydro Project

Tracey Williamson

This paper summarises the technical tour undertaken by a member of the British Dam Society in the international group of International Committee on Large Dams (ICOLD) 2013 attendees. The tour group travelled to the Cushman Hydro Project dams to the west of Seattle, where the dams are located in the Olympic National Park.


Dams and Reservoirs | 2011

Technical visit: ICOLD 2011, Lucerne: study tour T3 to Lucendro and Göscheneralp dams

Tracey Williamson

This article summarises the technical tour undertaken by a group attending ICOLD 2011, including members of the BDS, Andy Hughes and Tracey Williamson. The tour group travelled through the Reuss Valley in the south of Switzerland up to the Gotthard Pass with a visit to the 69 m high Lucendro buttress dam, completed just after Word War II. The buttresses have been laterally reinforced by massive struts to increase the stability of the structure. This was followed by a visit to the 155 m high Goscheneralp dam, completed in 1962, which consists of a central impervious core with rockfill shoulders.


Dams and Reservoirs | 2016

British Dam Society strategy: the future of the BDS

Tracey Williamson


Dams and Reservoirs | 2011

Meeting report: ICOLD 2011, Lucerne, Switzerland

Martin Ariey; Rod Bridle; Mike Cambridge; Andy Hughes; John Sawyer; Ljiljana Spasic-Gril; Tracey Williamson


Dams and Reservoirs | 2010

Waves and wave overtopping on reservoir structures

William Allsop; Tracey Williamson; Tim Pullen


Dams and Reservoirs | 2018

Inspecting engineer succession planning – plain sailing or choppy waters?

Anthea Peters; Craig Goff; David Littlemore; Tracey Williamson


Dams and Reservoirs | 2018

Meeting Report: SANCOLD Conference 2017

Tracey Williamson

Collaboration


Dive into the Tracey Williamson's collaboration.

Top Co-Authors

Avatar
Top Co-Authors

Avatar
Top Co-Authors

Avatar
Top Co-Authors

Avatar
Researchain Logo
Decentralizing Knowledge