Yujie Dong
Tsinghua University
Network
Latest external collaboration on country level. Dive into details by clicking on the dots.
Publication
Featured researches published by Yujie Dong.
Engineering | 2016
Zuoyi Zhang; Yujie Dong; Fu Li; Zhengming Zhang; Haitao Wang; Xiaojin Huang; Hong Li; Bing Liu; Xinxin Wu; Hong Wang; Xingzhong Diao; Haiquan Zhang; Jinhua Wang
ABSTRACT After the first concrete was poured on December 9, 2012 at the Shidao Bay site in Rongcheng, Shandong Province, China, the construction of the reactor building for the worlds first high-temperature gas-cooled reactor pebble-bed module (HTR-PM) demonstration power plant was completed in June, 2015. Installation of the main equipment then began, and the power plant is currently progressing well toward connecting to the grid at the end of 2017. The thermal power of a single HTR-PM reactor module is 250 MW th , the helium temperatures at the reactor core inlet/outlet are 250/750 °C, and a steam of 13.25 MPa/567 °C is produced at the steam generator outlet. Two HTR-PM reactor modules are connected to a steam turbine to form a 210 MW e nuclear power plant. Due to Chinas industrial capability, we were able to overcome great difficulties, manufacture first-of-a-kind equipment, and realize series major technological innovations. We have achieved successful results in many aspects, including planning and implementing RD these obtained experiences may also be referenced by the global nuclear community.
Engineering | 2016
Zuoyi Zhang; Yujie Dong; Fu Li; Zhengming Zhang; Haitao Wang; Xiaojin Huang; Hong Li; Bing Liu; Xinxin Wu; Hong Wang; Xingzhong Diao; Haiquan Zhang; Jinhua Wang
ABSTRACT After the first concrete was poured on December 9, 2012 at the Shidao Bay site in Rongcheng, Shandong Province, China, the construction of the reactor building for the worlds first high-temperature gas-cooled reactor pebble-bed module (HTR-PM) demonstration power plant was completed in June, 2015. Installation of the main equipment then began, and the power plant is currently progressing well toward connecting to the grid at the end of 2017. The thermal power of a single HTR-PM reactor module is 250 MW th , the helium temperatures at the reactor core inlet/outlet are 250/750 °C, and a steam of 13.25 MPa/567 °C is produced at the steam generator outlet. Two HTR-PM reactor modules are connected to a steam turbine to form a 210 MW e nuclear power plant. Due to Chinas industrial capability, we were able to overcome great difficulties, manufacture first-of-a-kind equipment, and realize series major technological innovations. We have achieved successful results in many aspects, including planning and implementing RD these obtained experiences may also be referenced by the global nuclear community.
Nuclear Engineering and Design | 2009
Zuoyi Zhang; Zongxin Wu; Dazhong Wang; Yuanhui Xu; Yuliang Sun; Fu Li; Yujie Dong
Nuclear Engineering and Design | 2006
Yujie Dong; Zuying Gao
Energy | 2017
Zhe Dong; Yifei Pan; Zuoyi Zhang; Yujie Dong; Xiaojin Huang
Annals of Nuclear Energy | 2016
Peng Liu; Zhipeng Chen; Yanhua Zheng; Jun Sun; Fubing Chen; Lei Shi; Fu Li; Yujie Dong; Zuoyi Zhang
Nuclear Engineering and Design | 2014
Minggang Lang; Yujie Dong
Nuclear Engineering and Design | 2016
Yangping Zhou; Pengfei Hao; Fu Li; Lei Shi; Feng He; Yujie Dong; Zuoyi Zhang
Advanced Powder Technology | 2017
Ximing Sun; Yujie Dong; Pengfei Hao; Lei Shi; Fu Li; Y.T. Feng
Archive | 2016
Zuoyi Zhang; Yujie Dong; Fu Li; Zhengming Zhang; Haitao Wang; Xiaojin Huang; Hong Li; Bing Liu; Xinxin Wu; Hong Wang; Xingzhong Diao; Haiquan Zhang; Jinhua Wang