Network


Latest external collaboration on country level. Dive into details by clicking on the dots.

Hotspot


Dive into the research topics where D. Guthrie is active.

Publication


Featured researches published by D. Guthrie.


ieee international pulsed power conference | 2004

Optical and pressure diagnostics of 4-MV water switches in the Z-20 test Facility

J. R. Woodworth; J.M. Lehr; Juan M. Elizondo-Decanini; P. A. Miller; Peter Eric Wakeland; M. Kincy; Joseph Garde; B. P. Aragon; William E. Fowler; G. Mowrer; J.E. Maenchen; G.S. Sarkisov; J.P. Corley; K.C. Hodge; S.A. Drennan; D. Guthrie; M. Navarro; D.L. Johnson; H.C. Ives; M.J. Slattery; D.A. Muirhead

We are studying the behavior of self-breaking, high-voltage water switches for the Z refurbishment project. In Z-20, three or four water switches in parallel are charged to 4 MV in /spl sim/220 ns. The water gap between switch electrodes is 13-15 cm, and the enhancement of the positive and negative electrodes is varied to study time-evolution of the breakdown arcs, current sharing, and switch simultaneity. In addition to the standard electrical diagnostics (V,I), we are looking at one or more of the switches during the breakdown phase with two optical diagnostics: a streak camera and a fast framing camera. The streak camera has /spl sim/1-ns resolution, and the framing camera provides seven frames with >5 ns exposure times. For identical electric fields, the streamers originating on the positive electrode form earlier and move more rapidly than the streamers originating on the negative electrode. We observe four distinct phases in the closure of the water switches that depend on the macroscopic electric fields in the water: 1) No streamers propagate at E-fields below /spl sim/100 kV/cm from positive electrodes or voltages below /spl sim/140 kV/cm for negative electrodes; 2) streamers propagate with constant velocity between 100 and /spl sim/300 kV/cm; 3) above 300 kV/cm, the streamer velocities become linearly proportional to the electric field; 4) above 600 kV/cm, the velocity of streamers from the negative electrodes appears to saturate at /spl sim/100 cm//spl mu/s. The velocity of the streamers from the positive electrode continues to increase with E-field, reaching /spl sim/1% of the speed of light when the switch reaches closure.


ieee international pulsed power conference | 2003

Development/tests of 6-MV triggered gas switches at SNL

J.P. Corley; K.C. Hodge; S.A. Drennan; D. Guthrie; J.M. Navarro; D.L. Johnson; J.M. Lehr; S. E. Rosenthal; J.M. Elizondo

Gas switch development for application in Z refurbishment (ZR) has continued since PPPS Conference 2001. Several iterations have been tested both in oil and water dielectrics. The first switch tested was an evolved version of the Sandia designed HERMES III switch [G. J. Denison et al., 1985]. The 6 MV ZR baseline switch consists of a self-breakdown (cascade) section in which the discharge current flows in several parallel channels, and a trigger section where the current flows through a single spark channel. The second switch tested is a cantilevered switch. The entire cascade section is cantilevered on a plastic support rod allowing for a single continuous insulator housing but having the same characteristics as the baseline. The third switch tested is a Sandia hybrid switch. The laser triggered section of the hybrid switch includes 5 cascade like electrodes connected in parallel to a triggered gap via a /spl sim/2 /spl mu/H series isolation inductor. The discharge current in the hybrid switch trigger section flows in several parallel channels eliminating the single channel flow as in the baseline switch trigger section. The design iterations of these switches and results of these tests are presented.


international conference on plasma science | 2007

ZR laser triggered gas switch requirements and performance

K. R. LeChien; M. E. Savage; D.E. Bliss; J.M. Lehr; J.E. Maenchen; D. H. McDaniel; K.W. Struve; W. A. Stygar; J. A. Van Den Avyle; J. R. Woodworth; J.P. Corley; Peter Eric Wakeland; V. Anaya; G. Feltz; D. Guthrie; K.C. Hodge; T. Thompson; Z.R. Wallace; K.R. Prestwich

The Z machine at Sandia National Laboratories is presently undergoing an upgrade, called Z-Refurbishment (ZR) [1], that is aimed at improving capacity, precision, and capability to essentially all of its pulsed power components, including its thirty six laser-triggered gas switches (LTGS). Voltage and current requirements for the ZR LTGS have increased 25% from the onset of the ZR program, with no allowable increase to the physical footprint (or inductance) for the device. Initial design studies indicated that a total machine peak current of 26 MA could be achieved with the each LTGS operating at 5 MV and 600 kA. Increases in the final design inductance in the transition from vertical water transmission lines to horizontal magnetically insulated transmission lines, higher inductance in vacuum from changes in the load position for improved diagnostic access, and conservatism in the vacuum power flow requirements caused the LTGS operational goal to become 5.4 MV and 750 kA for a total machine peak current of 23 MA in 100 ns to a 10 mm radius, 10 mm long wire array. A comprehensive research program was initiated in August 2005 to improve the performance of the ZR gas switch at the 5.4 MV level, and results of that effort to date are presented herein.


ieee international pulsed power conference | 2005

A 5-Megavolt, 600-Kiloampere Laser-Triggered Gas Switch for use on Z-R: Comparison of Experiments and Simulations

J. R. Woodworth; S. E. Rosenthal; J.M. Lehr; J.E. Maenchen; J.M. Elizondo; D. L. Johnson; J.P. Corley; K.C. Hodge; S.A. Drennan; D. Guthrie

The Z refurbishment project is designed to increase the peak current to the load on Z to ~26 MA in a 100-ns wide power pulse. This current is achieved by summing the current from 36 independent pulse-power modules. To meet these requirements, we have designed and constructed an SF6-insulated gas switch that can hold off 5.5 MV and conduct a peak current of 600 kA for over a hundred shots. The gas switch is charged by a Marx generator in ~1 microsecond and transfers about 200- kilojoules of energy and 0.25 Coulombs of charge to a pulse-forming line in a ~150-ns-wide power pulse peaking at 2.5 TW. The gas switch consists of a laser- triggered section holding off 15% of the voltage followed by 25 self-breakdown gaps. The self-breaking gaps are designed to provide multiple breakdown arcs in order to lower the overall inductance of the switch. The gas switch is submerged in transformer oil during operation. In this work, we show how simulation and experiment have worked together, first to verify proper operation of the switch, and then to solve problems with the switch design that arose during testing.


ieee international pulsed power conference | 2005

Performance of Self-Closing Diverter Switches for ZR/Z20 Marx and Intermediate Store Protection

J. Douglas; J. Banister; P. Corcoran; J. Goyer; R. Miller; D. Morton; H. Nishimoto; I. Smith; J.P. Corley; S.A. Drennan; D. Guthrie; K.C. Hodge; J.M. Lehr; J.E. Maenchen; D.L. Smith; R. Sears

The ZR refurbishment project [1] at Sandia National Laboratories (SNL) required a set of diverter switches to protect the Marx generators and intermediate storage (IS) capacitors from Marx pre-fire and/or laser triggered output switch (LTS) no-fire. Thirty-six such diverters, one for each Marx-IS set, will need to operate reliably over the full range of Marx charge voltages and LTS anticipated closure times. Operating voltage is up to 6 MV. A self-closing oil switch diverter was selected and design work began in late 2002. The first diverter (Phase I or just PI) was delivered in the summer of 2003 and tested on SNLs Z20 test-bed. Based on test results, operational experience and overall project budgetary concerns, it was decided to re-design the diverter, resulting a simpler, less costly switch. This new self- closing oil switch (Phase II or P2) was fielded at SNL on the Z20 test-bed in late 2004. Both designs include adjustable electrodes to control the closure time. Also incorporated is a mechanical clamp that minimizes or shorts the oil gap until Marx charge is complete. Both diverters feature liquid resistors sized to safely absorb the energy stored in the Marx or IS. This paper describes the design and test results from these diverters.


international power modulator symposium and high voltage workshop | 2004

SaTPro: the system assessment test program for ZR

J.M. Lehr; Douglas D. Bloomquist; J.P. Cortey; S.A. Drennan; D. Guthrie; H.C. Harjes; K.C. Hodge; D.L. Johnson; J.E. Maenchen; D. H. McDaniel; K.W. Struve

In the mid-90s, breakthroughs were achieved at Sandia with z-pinches for high energy density physics on the Saturn machine. These initial tests led to the modification of the PBFA II machine to provide high currents rather than the high voltage it was initially designed for. The success of z-pinch for high energy density physics experiments insured a new mission for the converted accelerator, known as Z since 1997. Z now provides a unique capability to a number of basic science communities and has expanded its mission to include radiation effects research, inertial confinement fusion and material properties research. To achieve continued success, the physics community has requested higher peak current, better precision and pulse shaping versatility be incorporated into the refurbishment of the Z machine, known as ZR. In addition to the performance specification for ZR of a peak current of 26 MA with an implosion time of 100 ns, the machine also has a reliability specification to achieve 400 shots per year. While changes to the basic architecture of the Z machine are minor, the vast majority of its components have been redesigned. Moreover the increase in peak current from its present 18 MA to ZRs peak current of 26 MA at nominal operating parameters requires significantly higher voltages. These higher voltages, along with the reliability requirement, mandate a system assessment be performed to insure the requirements have been met. This paper will describe the System Assessment Test Program (SATPro) for the ZR project and report on the results


ieee international pulsed power conference | 2003

Optical diagnostics of 4 MV water switches in the Z-20 test facility

J. R. Woodworth; J.M. Lehr; P. A. Miller; B. P. Aragon; J. M. Elizondo-decanini; William E. Fowler; J.E. Maenchen; G.S. Sarkisov; J.P. Corley; K.C. Hodge; S.A. Drennan; D. Guthrie; D. Mowrer; M. Navarro; D.L. Johnson

We are studying the behavior of self-breaking, high voltage water switches for the Z refurbishment project. In Z-20, 3 or 4 water switches in parallel are charged to 4 MV in /spl sim/220 ns. The water gap between switch electrodes is 13-15 cm and the enhancement of the positive and negative electrodes is varied to study current sharing and switch simultaneity. In addition to the standard electrical diagnostics (V, I) we are looking at one of the switches during the breakdown phase with two optical diagnostics: a streak camera and a fast framing camera. We find that the velocity of the streamers is approximately a linear function of macroscopic electric field, with streamers from positive electrodes having velocities about twice as fast as streamers from negative electrodes. We find that optical closure of the gap correlates well with the beginning of the main current pulse. We demonstrate that only about 2% of the total light emitted by the switches is emitted during the accelerator power pulse.


ieee international pulsed power conference | 2005

Towards the Autonomous Operation of Z20: A TW Pulsed Power Module

E.J. Dawson; T.L. Downey; K.C. Hodge; J.M. Lehr; J.P. Corley; S.A. Drennan; D. Guthrie; J.E. Maenchen; Z.R. Wallace; E.A. Weinbrect; V. Anaya

The Refurbished Z machine, ZR, has 3 distinct missions. The first is to increase the capability for the user community by providing higher peak currents. The second is to increase the precision by increasing pulse repeatability and pulse shape flexibility. The third is to increase the capacity by providing operational turnaround time consistent with conducting a shot per shift. The pursuit of the third mission relies heavily on the reliability of the components and well defined maintenance cycles. To test the performance of the ZR design, a system assessment module has been tested and found to meet the capability mission. The system assessment module will be used to test the reliability of the components comprising the ZR pulsed power modules. To assess the program goal of 1 failure in 50 ZR shots we plan to perform 7200 shots of the system assessment module, Z20. At a typical shot rate, this task would take approximately three years. To minimize the impact on the facility while obtaining the required reliability data, the system will be configured to fire and reset autonomously with the ultimate goal of unmanned operation. A systems approach was developed using National Instruments Lab VIEWreg software and Field Point I/O hardware. All communications between subsystems are provided via ethernet using fiber optic media converters. The major subsystems for operating the module which will be described are the gas pressure and purge, high voltage power supplies, oil diverter operation, triggering, precision monitoring of Marx system, personnel access control and remote operation of the laser trigger system.


Physical Review Special Topics-accelerators and Beams | 2008

Development of a 5.4 MV laser triggered gas switch for multimodule, multimegampere pulsed power drivers

K. R. LeChien; M. E. Savage; V. Anaya; D.E. Bliss; W. T. Clark; J.P. Corley; G. Feltz; J. E. Garrity; D. Guthrie; K.C. Hodge; J.E. Maenchen; R.A. Maier; K.R. Prestwich; K.W. Struve; W. A. Stygar; T. Thompson; J. Van Den Avyle; Peter Eric Wakeland; Z.R. Wallace; J. R. Woodworth


international conference on plasma science | 2007

Material Testing on High Voltage Laser Triggered Gas Switches for ZR

Peter Eric Wakeland; J.P. Corley; K.C. Hodge; D. Guthrie; V. Anaya; Z.R. Wallace; T. Thompson; G. Feltz; R.A. Maier; K. R. LeChien; M. E. Savage; Donald Francis Susan; R.P. Grant; J. A. Van Den Avyle

Collaboration


Dive into the D. Guthrie's collaboration.

Top Co-Authors

Avatar

K.C. Hodge

Sandia National Laboratories

View shared research outputs
Top Co-Authors

Avatar

J.E. Maenchen

Sandia National Laboratories

View shared research outputs
Top Co-Authors

Avatar

J.M. Lehr

Sandia National Laboratories

View shared research outputs
Top Co-Authors

Avatar

J. R. Woodworth

Sandia National Laboratories

View shared research outputs
Top Co-Authors

Avatar

S.A. Drennan

Sandia National Laboratories

View shared research outputs
Top Co-Authors

Avatar

Peter Eric Wakeland

Sandia National Laboratories

View shared research outputs
Top Co-Authors

Avatar

D.L. Johnson

Sandia National Laboratories

View shared research outputs
Top Co-Authors

Avatar

Z.R. Wallace

Sandia National Laboratories

View shared research outputs
Top Co-Authors

Avatar

D.E. Bliss

Sandia National Laboratories

View shared research outputs
Top Co-Authors

Avatar

M. E. Savage

Sandia National Laboratories

View shared research outputs
Researchain Logo
Decentralizing Knowledge