Gerald J. Posakony
Battelle Memorial Institute
Network
Latest external collaboration on country level. Dive into details by clicking on the dots.
Publication
Featured researches published by Gerald J. Posakony.
Archive | 2003
Charles W. Stewart; Spencer H. Bush; Calvin H. Delegard; Monte R. Elmore; A. Burton Johnson; Allan F. Pardini; Gerald J. Posakony; Fredric A. Simonen; Michael T. Terry; Philip E. Zapp
Video inspections in the annulus of Hanford double-shell waste storage tank 241-AY-101 in 2001 and earlier showed rust over large areas of the primary and secondary tank walls. These observations led to extensive on-destructive inspections and analyses to determine the extent and severity of the corrosion and correction of several operational deficiencies that contributed to the problem. PNNL has performed an independent review of the accumulated evidence from these efforts to determine whether unacceptable conditions were corrected and the current condition of the tank meets or exceeds technical and operational requirements. The findings of this review are the subject of this report. The conclusion is that AY-101 is fit for service without restriction subject to several recommendations for further inspections and analyses.
Archive | 2006
Allan F. Pardini; Gerald J. Posakony
COGEMA Engineering Corporation (COGEMA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic examination of selected portions of Double-Shell Tank 241-AN-103. PNNL is responsible for preparing a report(s) that describes the results of the COGEMA ultrasonic examinations.
Archive | 2005
Allan F. Pardini; Gerald J. Posakony
COGEMA Engineering Corporation (COGEMA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic nondestructive examination of selected portions of Double-Shell Tank 241-AP-104. The purpose of this examination was to provide information that could be used to evaluate the integrity of the wall of the primary and secondary tank. The requirements for the ultrasonic examination of Tank 241-AP-104 were to detect, characterize (identify, size, and locate), and record measurements made of any wall thinning that might be present in the wall of the primary tank in the upper knuckle region, and any wall thinning, pitting, or cracks in the wall of the secondary tank in the lower knuckle region. Any measurements that exceed the requirements set forth in the Engineering Task Plan (ETP), RPP-22571 (Jensen 2004) and summarized on page 1 of this document, are reported to CH2M Hill and the Pacific Northwest National Laboratory (PNNL) for further evaluation. Under the contract with CH2M Hill, all data is to be recorded on disk and paper copies of all measurements are provided to PNNL for third-party evaluation. PNNL is responsible for preparing a report that describes the results of the COGEMA ultrasonic examinations.
Archive | 2005
Allan F. Pardini; Gerald J. Posakony
COGEMA Engineering Corporation (COGEMA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic nondestructive examination of selected portions of Double-Shell Tank 241-AP-102. The purpose of this examination was to provide information that could be used to evaluate the integrity of the wall of the primary tank. The requirements for the ultrasonic examination of Tank 241-AP-102 were to detect, characterize (identify, size, and locate), and record measurements made of any wall thinning, pitting, or cracks that might be present in the wall of the primary tank. Any measurements that exceed the requirements set forth in the Engineering Task Plan (ETP), RPP-22571 (Jensen 2004) and summarized on page 1 of this document, are reported to CH2M Hill and the Pacific Northwest National Laboratory (PNNL) for further evaluation. Under the contract with CH2M Hill, all data is to be recorded on disk and paper copies of all measurements are provided to PNNL for third-party evaluation. PNNL is responsible for preparing a report that describes the results of the COGEMA ultrasonic examinations.
Archive | 2005
Allan F. Pardini; Gerald J. Posakony
COGEMA Engineering Corporation (COGEMA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic examination of selected portions of Double-Shell Tank 241-AN-104. PNNL is responsible for preparing a report(s) that describes the results of the COGEMA ultrasonic examinations.
Archive | 2005
Allan F. Pardini; Gerald J. Posakony
COEGMA Engineering Corporation (COGEMA) under a contract from CH2M Hill Hanford Group (CH2M Hill) has performed an ultrasonic examination of selected portions of Double-Shell Tank 241-AN-101. PNNL is responsible for preparing a report(s) that describes the results of the COGEMs ultrasonic examinations.
Archive | 2004
Allan F. Pardini; Gerald J. Posakony
COGEMA Engineering Corporation (COGEMA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic nondestructive examination of selected portions of Double-Shell Tank 241-SY-101. The purpose of this examination was to provide information that could be used to evaluate the integrity of the wall of the primary tank. The requirements for the ultrasonic examination of Tank 241-SY-101 were to detect, characterize (identify, size, and locate), and record measurements made of any wall thinning, pitting, or cracks that might be present in the wall of the primary tank. Any measurements that exceed the requirements set forth in the Engineering Task Plan (ETP), RPP-17750 (Jensen 2003) and summarized on page 1 of this document, are reported to CH2M Hill and the Pacific Northwest National Laboratory (PNNL) for further evaluation. Under the contract with CH2M Hill, all data is to be recorded on disk and paper copies of all measurements are provided to PNNL for third-party evaluation. PNNL is responsible for preparing a report that describes the results of the COGEMA ultrasonic examinations.
Archive | 2004
Allan F. Pardini; Gerald J. Posakony
COGEMA Engineering Corporation (COGEMA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic nondestructive examination of selected portions of Double-Shell Tank 241-AP-106. The purpose of this examination was to provide information that could be used to evaluate the integrity of the wall of the primary tank. The requirements for the ultrasonic examination of Tank 241-AP-106 were to detect, characterize (identify, size, and locate), and record measurements made of any wall thinning, pitting, or cracks that might be present in the wall of the primary tank. Any measurements that exceed the requirements set forth in the Engineering Task Plan (ETP), RPP-22571 (Jensen 2004) and summarized on page 1 of this document, are reported to CH2M Hill and the Pacific Northwest National Laboratory (PNNL) for further evaluation. Under the contract with CH2M Hill, all data is to be recorded on disk and paper copies of all measurements are provided to PNNL for third-party evaluation. PNNL is responsible for preparing a report that describes the results of the COGEMA ultrasonic examinations.
Archive | 2004
Allan F. Pardini; Gerald J. Posakony
COGEMA Engineering Corporation (COGEMA), under a contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic nondestructive examination of selected portions of Double-Shell Tank 241-AP-104. The purpose of this examination was to provide information that could be used to evaluate the integrity of the wall of the primary tank. The requirements for the ultrasonic examination of Tank 241-AP-104 were to detect, characterize (identify, size, and locate), and record measurements made of any wall thinning, pitting, or cracks that might be present in the wall of the primary tank. Any measurements that exceed the requirements set forth in the Engineering Task Plan (ETP), RPP-17750 (Jensen 2003) and summarized on page 1 of this document, are reported to CH2M Hill and the Pacific Northwest National Laboratory (PNNL) for further evaluation. Under the contract with CH2M Hill, all data is to be recorded on disk and paper copies of all measurements are provided to PNNL for third-party evaluation. PNNL is responsible for preparing a report that describes the results of the COGEMA ultrasonic examinations.
Archive | 2003
Allan F. Pardini; Gerald J. Posakony
COGEMA Engineering Corporation (COGEMA), under contract from CH2M Hill Hanford Group (CH2M Hill), has performed an ultrasonic examination of selected portions of Double-Shell Tank 241-AP-103. PNNL is responsible for preparing a report(s)that describes the results of the COGEMA ultrasonic examinations.