Network


Latest external collaboration on country level. Dive into details by clicking on the dots.

Hotspot


Dive into the research topics where Philippe Duhoux is active.

Publication


Featured researches published by Philippe Duhoux.


Proceedings of SPIE | 2004

VLTI technical advances: present and future

Andreas Glindemann; Maja Albertsen; Luigi Andolfato; Gerardo Avila; Pascal Ballester; Bertrand Bauvir; Francoise Delplancke; Frederic Derie; Martin Dimmler; Philippe Duhoux; Emmanuel di Folco; R. Frahm; Emmanuel Galliano; Bruno Gilli; Paul Giordano; Philippe B. Gitton; Stephane Guisard; Nico Housen; Christian A. Hummel; Alexis Huxley; Robert Karban; Pierre Kervella; M. Kiekebusch; Bertrand Koehler; Samuel A. Leveque; Tom Licha; Antonio Longinotti; Derek J. McKay; Serge Menardi; Guy J. Monnet

The Very Large Telescope Interferometer (VLTI) on Cerro Paranal (2635 m) in Northern Chile reached a major milestone in September 2003 when the mid infrared instrument MIDI was offered for scientific observations to the community. This was only nine months after MIDI had recorded first fringes. In the meantime, the near infrared instrument AMBER saw first fringes in March 2004, and it is planned to offer AMBER in September 2004. The large number of subsystems that have been installed in the last two years - amongst them adaptive optics for the 8-m Unit Telescopes (UT), the first 1.8-m Auxiliary Telescope (AT), the fringe tracker FINITO and three more Delay Lines for a total of six, only to name the major ones - will be described in this article. We will also discuss the next steps of the VLTI mainly concerned with the dual feed system PRIMA and we will give an outlook to possible future extensions.


Proceedings of SPIE | 2006

PRIMA for the VLTI: a status report

Francoise Delplancke; Frederic Derie; Samuel A. Leveque; Serge Menardi; Roberto Abuter; Luigi Andolfato; Pascal Ballester; Jeroen de Jong; Nicola Di Lieto; Philippe Duhoux; R. Frahm; Philippe B. Gitton; Andreas Glindemann; Ralf Palsa; Florence Puech; Johannes Sahlmann; Nicolas Schuhler; Thanh Phan Duc; Bruno Valat; Anders Wallander

PRIMA, the Phase-Referenced Imaging and Micro-arcsecond Astrometry facility for the Very Large Telescope Interferometer, is now nearing the end of its manufacturing phase. An intensive test period of the various sub-systems (star separators, fringe sensor units and incremental metrology) and of their interactions in the global system will start in Garching as soon as they are delivered. The status and performances of the individual sub-systems are presented in this paper as well as the proposed observation and calibration strategy to reach the challenging goal of high-accuracy differential astrometry at 10 μas level.


Proceedings of SPIE | 2012

VLT deformable secondary mirror: integration and electromechanical tests results

Roberto Biasi; Mario Andrighettoni; Gerald Angerer; C. Mair; Dietrich Pescoller; Paolo Lazzarini; E. Anaclerio; Marco Mantegazza; Daniele Gallieni; Elise Vernet; Robin Arsenault; Pierre-Yves Madec; Philippe Duhoux; Armando Riccardi; Marco Xompero; Runa Briguglio; Mauro Manetti; Marco Morandini

The VLT Deformable secondary is planned to be installed on the VLT UT#4 as part of the telescope conversion into the Adaptive Optics test Facility (AOF). The adaptive unit is based on the well proven contactless, voice coil motor technology that has been already successfully implemented in the MMT, LBT and Magellan adaptive secondaries, and is considered a promising technical choice for the forthcoming ELT-generation adaptive correctors, like the E-ELT M4 and the GMT ASM. The VLT adaptive unit has been recently assembled after the completion of the manufacturing and modular test phases. In this paper, we present the most relevant aspects of the system integration and report the preliminary results of the electromechanical tests performed on the unit. This test campaign is a typical major step foreseen in all similar systems built so far: thanks to the metrology embedded in the system, that allows generating time-dependent stimuli and recording in real time the position of the controlled mirror on all actuators, typical dynamic response quality parameters like modal settling time, overshoot and following error can be acquired without employing optical measurements. In this way the system dynamic and some aspect of its thermal and long term stability can be fully characterized before starting the optical tests and calibrations.


Proceedings of SPIE | 2012

VISIR upgrade overview and status

Florian Kerber; H. U. Käufl; Pedro Baksai; Nicola Di Lieto; Danuta Dobrzycka; Philippe Duhoux; Gert Finger; Stephanie Heikamp; Derek Ives; Gerd Jakob; Lars Lundin; Dimitri Mawet; Leander Mehrgan; Y. Momany; Vincent Moreau; E. Pantin; Miguel Riquelme; Stefan Sandrock; Ralf Siebenmorgen; Alain Smette; Julian Taylor; Mario E. van den Ancker; Guillermo Valdes; Lars Venema; Ueli Weilenmann

We present an overview of the VISIR upgrade project. VISIR is the mid-infrared imager and spectrograph at ESO’s VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan is based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As AQUARIUS detector array (Raytheon) which has been carefully characterized in ESO’s IR detector test facility (modified TIMMI 2 instrument). A prism spectroscopic mode will cover the N-band in a single observation. New scientific capabilities for high resolution and high-contrast imaging will be offered by sub-aperture mask (SAM) and phase-mask coronagraphic (4QPM/AGPM) modes. In order to make optimal use of favourable atmospheric conditions a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a user-defined constraint on water vapour. During the commissioning in 2012 it was found that the on-sky sensitivity of the AQUARIUS detector was significantly below expectations and that VISIR was not ready to go back to science operations. Extensive testing of the detector arrays in the laboratory and on-sky enabled us to diagnose the cause for the shortcoming of the detector as excess low frequency noise (ELFN). It is inherent to the design chosen for this detector and can’t be remedied by changing the detector set-up. Since this is a form of correlated noise its impact can be limited by modulating the scene recorded by the detector. We have studied several mitigation options and found that faster chopping using the secondary mirror (M2) of the VLT offers the most promising way forward. Faster M2 chopping has been tested and is scheduled for implementation before the end of 2014 after which we plan to re-commission VISIR. In addition an upgrade of the IT infrastructure related to VISIR is planned in order to support burst-mode operations. The upgraded VISIR will be a powerful instrument providing close to background limited performance for diffraction-limited observations at an 8-m telescope. It will offer synergy with facilities such as ALMA, JWST, VLTI and SOFIA, while a wealth of targets is available from survey work (e.g. VISTA, WISE). In addition it will bring confirmation of the technical readiness and scientific value of several aspects of potential mid-IR instrumentation at Extremely Large Telescopes.


Proceedings of SPIE | 2008

Design and performances of the Shack-Hartmann sensor within the Active Phasing Experiment

Ruben Mazzoleni; F. Gonte; Isabelle Surdej; C. Araujo; Roland Brast; Frederic Derie; Philippe Duhoux; Christophe Dupuy; Christoph Frank; Robert Karban; Lothar Noethe; N. Yaitskova

The Shack-Hartmann Phasing Sensor (SHAPS) has been integrated in the Active Phasing Experiment (APE) at ESO. It is currently under test in the laboratory. The tests on sky are foreseen for the end of 2008, when APE will be mounted at the Nasmyth focus of one of the VLT unit telescopes. SHAPS is based on the Shack-Hartmann principle: the lenslet array is located in a plane which is optically conjugated to the Active Segmented Mirror (ASM) of APE and is composed of two types of microlenses, circular and cylindrical, which give information about the wavefront slope and the piston steps, respectively. This proceeding contains a description of SHAPS and of the algorithms implemented for the wavefront reconstruction and for the phasing. The preliminary results obtained during the laboratory tests are discussed and compared with the theoretical predictions. The performances of SHAPS at the VLT and at the European Extremely Large Telescope (E-ELT) are estimated.


Proceedings of SPIE | 2014

ESO adaptive optics facility progress and first laboratory test results

Robin Arsenault; Pierre-Yves Madec; Jerome Paufique; Paolo La Penna; Stefan Stroebele; Elise Vernet; Jean-Francois Pirard; W. Hackenberg; Harald Kuntschner; Johann Kolb; Nicolas Muller; Aurea Garcia-Rissmann; Miska Le Louarn; Paola Amico; Norbert Hubin; Jean-Louis Lizon; Rob Ridings; Pierre Haguenauer; José Antonio Abad; Gerhard Fischer; Volker Heinz; M. Kiekebusch; Javier Argomedo; Ralf Conzelmann; Sebastien Tordo; R. Donaldson; Christian Soenke; Philippe Duhoux; Enrico Fedrigo; Bernard Delabre

The Adaptive Optics Facility project is completing the integration of its systems at ESO Headquarters in Garching. The main test bench ASSIST and the 2nd Generation M2-Unit (hosting the Deformable Secondary Mirror) have been granted acceptance late 2012. The DSM has undergone a series of tests on ASSIST in 2013 which have validated its optical performance and launched the System Test Phase of the AOF. This has been followed by the performance evaluation of the GRAAL natural guide star mode on-axis and will continue in 2014 with its Ground Layer AO mode. The GALACSI module (for MUSE) Wide-Field-Mode (GLAO) and the more challenging Narrow-Field-Mode (LTAO) will then be tested. The AOF has also taken delivery of the second scientific thin shell mirror and the first 22 Watt Sodium laser Unit. We will report on the system tests status, the performances evaluated on the ASSIST bench and advancement of the 4Laser Guide Star Facility. We will also present the near future plans for commissioning on the telescope and some considerations on tools to ensure an efficient operation of the Facility in Paranal.


Astronomical Telescopes and Instrumentation | 2000

VLT astronomical site monitor: control, automation, and data flow

Stefan Sandrock; R. Amestica; Philippe Duhoux; Julio Navarrete; Marc S. Sarazin

As major observatories are planning automatic and optimized scheduling of large astronomical facilities, reliable and accurate monitoring of observing conditions is a pre- requisite. For this purpose, the concept of Astronomical Site Monitor has been developed for the VLT as an integrated sub-system of the observatory.


Proceedings of SPIE | 2012

ESO Adaptive Optics Facility Progress Report

Robin Arsenault; Pierre-Yves Madec; Jerome Paufique; Paolo La Penna; Stefan Stroebele; Elise Vernet; Jean-Francois Pirard; W. Hackenberg; Harald Kuntschner; L. Jochum; Johann Kolb; Nicolas Muller; Miska Le Louarn; Paola Amico; Norbert Hubin; Jean-Louis Lizon; Rob Ridings; José Antonio Abad; Gert Fischer; Volker Heinz; M. Kiekebusch; Javier Argomedo; Ralf Conzelmann; Sebastien Tordo; Robert Donaldson; Christian Soenke; Philippe Duhoux; Enrico Fedrigo; Bernard Delabre; A. Jost

The ESO Adaptive Optics Facility (AOF) consists in an evolution of one of the ESO VLT unit telescopes to a laser driven adaptive telescope with a deformable mirror in its optical train. The project has completed the procurement phase and several large structures have been delivered to Garching (Germany) and are being integrated (the AO modules GRAAL and GALACSI and the ASSIST test bench). The 4LGSF Laser (TOPTICA) has undergone final design review and a pre-production unit has been built and successfully tested. The Deformable Secondary Mirror is fully integrated and system tests have started with the first science grade thin shell mirror delivered by SAGEM. The integrated modules will be tested in stand-alone mode in 2012 and upon delivery of the DSM in late 2012, the system test phase will start. A commissioning strategy has been developed and will be updated before delivery to Paranal. A substantial effort has been spent in 2011-2012 to prepare the unit telescope to receive the AOF by preparing the mechanical interfaces and upgrading the cooling and electrical network. This preparation will also simplify the final installation of the facility on the telescope. A lot of attention is given to the system calibration, how to record and correct any misalignment and control the whole facility. A plan is being developed to efficiently operate the AOF after commissioning. This includes monitoring a relevant set of atmospheric parameters for scheduling and a Laser Traffic control system to assist the operator during the night and help/support the observing block preparation.


Proceedings of SPIE | 2006

The VLTI auxiliary telescopes: measured performances

Bertrand Koehler; Maximilian Kraus; J.-M. Moresmau; Krister Wirenstrand; Philippe Duhoux; Robert Karban; Luigi Andolfato; F. Gonte

The Very Large Telescope Interferometer (VLTI)1 that coherently combines the four VLT 8.2-m Unit Telescopes (UTs) is on the point to be fully equipped with its dedicated array of Auxiliary Telescopes (ATs). This array includes four 1.8-m telescopes which can be relocated on thirty observing stations distributed on the top of the Paranal Observatory. This array, albeit less sensitive than the array of UTs, is a key element for the scientific operation of the VLTI. Indeed, it will provide the best imaging capability thanks to the many possible baselines (up to 200m), it will be used for the Narrow Angle Astrometry mode which requires long term monitoring and the longest baselines not accessible with the UTs, and it will enable full-time use of the VLTI facilities even when the UTs are used for stand-alone observation. The Auxiliary Telescopes have been designed, manufactured and tested in Europe by the company AMOS (Belgium) under ESO contract. After acceptance in Europe, ESO takes over the responsibility for the transport to Paranal, reassembly and final commissioning. Currently the first three ATs have been put into operation on Paranal while the fourth one is scheduled to arrive at the observatory in August 2006. This paper presents the actual performances of the Auxiliary Telescopes, as measured during the commissioning of the first three ATs. An emphasis is given to the requirements dictated by the interferometer needs, including the ease and accuracy with which the telescopes can be relocated, the excellent image quality, and the nanometer-level stability for Optical Path Length.


Proceedings of SPIE | 2004

Designing a common real-time controller for VLT applications

Bertrand Bauvir; Anders Wallander; Philippe Duhoux; Alexis Huxley; Robert Karban

The increasing number of digital control applications in the context of the VLT, and particularly the VLT Interferometer, brought the need to find a common solution to address the problems of performance and maintainability. Tools for Advanced Control (TAC) aims at helping both control and software engineers in the design and prototyping of real-time control applications by providing them with a set of standard functions and an easy way to combine them to create complex control algorithms. In this paper we describe the software architecture and design of TAC, the VLT standard for digital control applications. Algorithms are described at schematic level and take the form of a set of interconnected function blocks. Periodical execution of the algorithm as well as features like runtime modification of parameters and probing of internal data are also managed by TAC, allowing the application designers to avoid spending time writing low value software code and therefore focus on application-specific concerns. We also summarize the results achieved on the first actual applications using TAC, to manage real-time control or digital signal processing algorithms, currently deployed and being commissioned at Paranal Observatory.

Collaboration


Dive into the Philippe Duhoux's collaboration.

Top Co-Authors

Avatar

M. Kiekebusch

European Southern Observatory

View shared research outputs
Top Co-Authors

Avatar

Robert Karban

European Southern Observatory

View shared research outputs
Top Co-Authors

Avatar

Robin Arsenault

European Southern Observatory

View shared research outputs
Top Co-Authors

Avatar

Frederic Derie

European Southern Observatory

View shared research outputs
Top Co-Authors

Avatar

Elise Vernet

European Southern Observatory

View shared research outputs
Top Co-Authors

Avatar

Javier Argomedo

European Southern Observatory

View shared research outputs
Top Co-Authors

Avatar

Jerome Paufique

European Southern Observatory

View shared research outputs
Top Co-Authors

Avatar

Johann Kolb

European Southern Observatory

View shared research outputs
Top Co-Authors

Avatar

Pierre-Yves Madec

European Southern Observatory

View shared research outputs
Top Co-Authors

Avatar

F. Gonte

European Southern Observatory

View shared research outputs
Researchain Logo
Decentralizing Knowledge